News

Construction continues at Terminal 3, Shenzhen Bo’an Airport

December 04 2012 — by Karina Armburg Jennings
Appointments
We are pleased to share some images showing the incredible internal spaces at Terminal 3, Shenzhen Bo'an Airport, as construction continues.


Images / Studio Fuksas
Images / Studio Fuksas
Alongside architects Studio Fuksas, we developed the lighting concept to transform the roof into a three dimensional lantern with all functional light concealed from view. The airport will handed over to the Airport Authority early in 2013 for testing and will be operational in 2014.